外墙外保温施工方案--苯板

外墙外保温施工方案--苯板

ID:13005209

大小:313.50 KB

页数:9页

时间:2018-07-20

外墙外保温施工方案--苯板_第1页
外墙外保温施工方案--苯板_第2页
外墙外保温施工方案--苯板_第3页
外墙外保温施工方案--苯板_第4页
外墙外保温施工方案--苯板_第5页
资源描述:

《外墙外保温施工方案--苯板》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、外墙外保温项目施工方案constructionworkareaintheformofconferencereviews.(2)reviewprogramreviewdateisdeterminedbytheprojectmanager;AccordingtotheprojectmanagerofprojectqualitycontrolDepartmentrequirespreparationofamanagementplan,representativeofthemanagementauditoftheproject,approvedbytheprojectmanage

2、r;ReviewProjectOfficeissuednoticesofmeetings;Projectmanagerfacilitatesthereviewmeeting,scheduledcontentunderreview;QualitycontrolDepartmentisresponsiblefortherecords,thepreparationofthereviewreportandcorrectiveactionplan,representativeofthemanagementauditoftheproject,approvedbytheprojectm

3、anager;QualitycontrolDepartmentisresponsibleforthepreparationofrecordsandreportsthedistributionlist,orpublishtotheInternetbyengineeringpartoftheprojectstaffanddepartments.OrganizedbythequalitycontrolDepartmentisresponsiblefortrackingtheimplementationofcorrectivemeasuresinspections.3.4.5th

4、eoutputfromthemanagementreviewshallincludethefollowingelements:theeffectivenessandsuitabilityofthequalitymanagementsystem,whetheritbemaintainedandrevised;Qualitypolicyandqualityobjectivesareachievedandtomeetcustomerrequirements,whetheritbemaintainedandrevised;Theallocationofresourcestomee

5、trequirements,whetheryouneedtoaddoradjust.3.4.6correctiveactiontrackingandverificationontheissuesraisedinthereview,bytheprimaryresponsibilityofdepartmentsdrawupcorrespondingspecificcorrective,preventiveandcorrectivemeasures,andseriouslyimplemented.ProjectqualitycontrolDepartmentisresponsi

6、bleforthetracking,verificationandevaluationtheeffectofcorrectiveandpreventiveactions.3.4....(1)thesafetyprogramsanddepartmentsdealingwiththeformationofurbanspatial9外墙外保温项目施工方案1、施工条件(1)基层墙面及找平层应干燥并已验收合格。门、窗框已安装到位。(2)施工现场环境温度和找平层表面温度,在施工中及施工后24小时内不得低于5℃,风力不大于5级。(3)施工面应避免阳光直射,必要时在脚手架上设临时遮阳设施

7、。(4)雨天施工时,应采取有效措施,防止雨水冲刷墙面。(5)墙身施工过程中,所采取的保护措施,应待泛水密封膏等永久保护构造按要求施工完毕后,方可拆除。(6)作业现场应保持环境清洁。2、主要施工工具劈纸刀、螺丝刀、剪刀、钢锯条、墨斗、棕刷、粗砂纸、电动搅拌器、塑料搅拌桶、冲击钻、电锤、抹子、压子、阴阳角抿子、托线板、2m靠尺等。3、施工要点(1)调整脚手架,使架管或管头与墙面的最小距离为400mm,以便施工。(2)基层墙体处理a.彻底清楚墙体表面的油、灰尘、污垢、脱模剂、风化物等影响粘结强度的材料。b.基层找平:用1:3水泥砂浆

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。