1、抗浮锚杆施工记录表(1号钻机李树红)工程名称:通州土桥序号锚杆编号施工日期钻孔直径(mm)有效长度(m)钢筋长度(m)施工开始时间施工完成时间注浆量(m3)补浆量(m3)备注16082014.11.2815014.81620:1520:303.48543.525782014.11.2815014.81620:3520:513.48543.535582014.11.2815014.81620:5721:183.48543.545332014.11.2815014.81621:2321:423.48543.556092014.11.2815014.81621:4522:103.48543.565
2、792014.11.2815014.81622:1422:313.48543.575592014.11.2815014.81622:4123:103.48543.585342014.11.2815014.81623:1523:343.48543.596002014.11.2915014.81623:510:123.48543.5105802014.11.2915014.8160:170:363.48543.5115602014.11.2915014.8160:400:573.48543.5125352014.11.2915014.8161:151:343.48543.5136112014.1
3、1.2915014.8161:381:573.48543.5145812014.11.2915014.8162:102:143.48543.5155362014.11.2915014.8162:312:353.48543.5165372014.11.2915014.8162:423:053.48543.5175822014.11.2915014.8163:123:313.48543.5186122014.11.2915014.8163:353:543.48543.5196132014.11.2915014.8163:574:163.48543.5205382014.11.2915014.81
4、64:194:373.48543.5技术负责人:记录:抗浮锚杆施工记录表(1号钻机李树红)工程名称:通州土桥序号锚杆编号施工日期钻孔直径(mm)有效长度(m)钢筋长度(m)施工开始时间施工完成时间注浆量(m3)补浆量(m3)备注215832014.11.2915014.8164:384:543.48543.5225612014.11.2915014.8165:175:363.48543.5236142014.11.2915014.8165:385:563.48543.5245392014.11.2915014.8165:586:173.48543.5255622014.11.2915014.
5、8169:009:183.48543.5265842014.11.2915014.8169:209:343.48543.5276152014.11.2915014.8169:3610:003.48543.5286162014.11.2915014.81610:0110:203.48543.5296172014.11.2915014.81610:2110:403.48543.5305402014.11.2915014.81610:4211:053.48543.5315852014.11.2915014.81612:4012:583.48543.5325862014.11.2915014.816
6、13:1013:323.48543.5335632014.11.2915014.81613:3313:523.48543.5345642014.11.2915014.81613:5314:093.48543.5355872014.11.2915014.81614:1014:283.48543.5365412014.11.2915014.81614:3014:583.48543.5375422014.11.2915014.81615:0015:183.48543.5385142014.11.2915014.81615:2015:403.48543.5394892014.11.2915014.8
7、1615:4116:003.48543.5405132014.11.2915014.81616:0116:183.48543.5技术负责人:记录:抗浮锚杆施工记录表(1号钻机李树红)工程名称:通州土桥序号锚杆编号施工日期钻孔直径(mm)有效长度(m)钢筋长度(m)施工开始时间施工完成时间注浆量(m3)补浆量(m3)备注414622014.11.2915014.81616:2016:453.48543.5424