ydt 5077-2005 固定电话交换设备安装工程验收规范

ydt 5077-2005 固定电话交换设备安装工程验收规范

ID:12918283

大小:674.30 KB

页数:39页

时间:2018-07-19

ydt 5077-2005 固定电话交换设备安装工程验收规范_第1页
ydt 5077-2005 固定电话交换设备安装工程验收规范_第2页
ydt 5077-2005 固定电话交换设备安装工程验收规范_第3页
ydt 5077-2005 固定电话交换设备安装工程验收规范_第4页
ydt 5077-2005 固定电话交换设备安装工程验收规范_第5页
资源描述:

《ydt 5077-2005 固定电话交换设备安装工程验收规范》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、中华人民共和国通信行业标准YD/T5077-2005固定电话交换设备安装工程验收规范AcceptingSpecificationforPSTNExchangeInstallationEngineering2005-10-08发布2006-01-01实施中华人民共和国信息产业部发布中华人民共和国通信行业标准固定电话交换设备安装工程验收规范AcceptingSpecificationforPSTNExchangeInstallationEngineeringy.)/T5077-2005主管部门:信息产业部综合规

2、划司批准部门:中华人民共和国信息产业部施行日期:2006年1月1日关于发布《固定电话交换设备安装工程验收规范》的通知信部规〔20055)470号各省、自治区、直辖市通信管理局,中国电信集团公司、中国网络通信集团公司、中国移动通信集团公司、中国联合通信有限公司、中国卫星通信集团公司、中国铁通集团有限公司,中讯邮电咨询设计院,中国通信建设总公司:现将《固定电话交换设备安装工程验收规范)(编号:YD/T5077-2005)发布,自2006年1月1日起实行。原《程控电话交换设备安装工程验收规范》(编号:YD/T50

3、77-98)同时废止。本规范由部综合规划司负责解释、监督执行。本规范由北京邮电大学出版社负责出版发行。中华人民共和国信息产业部-00五年十月八日前言本规范是根据信息产业部“关于安排《通信工程建设标准》修订和制定计划的通知”(信部规函「2004]508号)的要求,对原中华人民共和国通信行业标准YD5077-1998《程控电话交换设备安装工程验收规范》进行了修订。本规范的主要内容有:总则、工程验收前检查、工程初验、工程试运转、工程终验等。本规范用黑体字标注的条文为强制性条文,必须严格执行。本规范由信息产业部综合

4、规划司负责解释、监督执行。规范在使用过程中,如有需要补充或修改的内容,请与部综合规划司联系,并将补充或修改意见寄部综合规划司(地址:北京市西长安街13号,邮编:100804>0原主编单位:北京市电信规划设计院修订主编单位:北京市电信规划设计院主要起草人:张劲、郭丽华修订参编单位:中国通信建设北京工程局主要参加人:尚瑞目次1总则·.................................................................12工程验收前检查·················

5、···························⋯⋯22.1环境检查················································一22.2安全检查····················,·························⋯⋯22.3机架设备···············································⋯⋯32.4机台和终端设备·········································⋯⋯32.

6、5总配线架及各种配线架···························⋯⋯32.6电缆走道及槽道······································⋯⋯42.7布放电缆··········································⋯⋯52.8插接架间电缆及布线······························,·⋯⋯52.9敷设电源线············································⋯⋯52.10电缆芯线安装

7、·······································⋯⋯62.11敷设光纤············································⋯⋯,.⋯72.12接地检查··············································⋯⋯72.13通电测试前的检查·······································⋯⋯72.14硬件检查测试···································

8、········⋯⋯82.15系统检查测试··········································⋯⋯83工程初验··························································。二113.1初验测试要求·············································⋯⋯113.2可靠性测试·········

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。