黔艳线停电备用电源方案(最终版))2011.12.19

黔艳线停电备用电源方案(最终版))2011.12.19

ID:12661323

大小:381.50 KB

页数:27页

时间:2018-07-18

黔艳线停电备用电源方案(最终版))2011.12.19_第1页
黔艳线停电备用电源方案(最终版))2011.12.19_第2页
黔艳线停电备用电源方案(最终版))2011.12.19_第3页
黔艳线停电备用电源方案(最终版))2011.12.19_第4页
黔艳线停电备用电源方案(最终版))2011.12.19_第5页
资源描述:

《黔艳线停电备用电源方案(最终版))2011.12.19》由会员上传分享,免费在线阅读,更多相关内容在教育资源-天天文库

1、500kV黔艳ⅠⅡ回线路停电厂用备用电源方案批准:审核:会签:编制:税远鹏、张云杰、王东2011年12月19日sectionoftheDepartmentofprojectmanagement;Projectdocumentsandinformation:ProjectEngineeringDepartment;Materialsandequipment:materialsupplyprojects;Securitycontrols:theprojectDepartmentofsafetyandsecurity;Co

2、nstructionmachinery:ProjectEngineeringDepartment;Financial:ProjectManagementDepartmentoffinance;Securityandfireservices:projectsecurity.3.3.5managementrepresentativeandprojectmanagerinthisitemspecifiesthattheChiefEngineeristhemanagementrepresentative,responsibl

3、efortheoperationofqualitymanagementsystemandsupervision,regardlessofhowhisotherresponsibilities,shouldhaveaclearmandateto:ensurethatthequalitymanagementsystemisimplementedandmaintained;Therunningofthequalitymanagementsystemtotheprojectmanager,includingneededimp

4、rovements;Alwaysbeawarethatthecustomer'sneedsandrequirements.3.43.4.1projectmanagementreviewshouldbeanannualreviewofitsqualitymanagementsystemtoensureitscontinuingsuitability,adequacyandeffectiveness.3.4.2Administrationreviewbytheprojectmanagerresponsiblefororg

5、anizationandimplementation,projectqualitycontrolDepartmentisresponsibleforspecifictasks.3.4.3themanagementreviewshouldcompareandevaluatethefollowinginput:internalandexternalqualityauditsandcorrectiveeffect;Customerfeedbackontheconstruction,installation,commissi

6、oning,serviceinformation(complaintsandsatisfaction);Qualityrecords,qualitycompliancewithtrendreports,analysisofresults;Combinedwiththequalitypolicyandtheachievementofthegoals,statusandsuitabilityevaluationofthequalitymanagementsystemtodeterminecorrective,preven

7、tiveandimprovementmeasuresofperformance.3.4.4evaluationmethodandprocedure(1)review:bytheprojectmanager,projectmanager,functionaldepartmentsandheadsofspecialized因黔艳ⅠⅡ回线线停电2天,停电期间我厂#01启备变停电,相应主厂房设备、辅助车间设备、检修、照明等均无电源供电。为保证#1机组停运后的设备安全、#2机组操作电源、控制电源正常、脱硫设备安全、翻车机系统正

8、常卸煤,拟引接备用电源。一、电源引接方案:1、恢复10kV施工开关站1461馈线开关出线原3*185mm210kV电缆(约800米)接至#2补充水隔离变压器10kV侧柱上隔离开关出线侧(已搭接)。在#1补充水隔离变高压侧隔离开关处引接一根3*185mm210kV电缆(约20米)至#2补充水隔离变10kV隔离开关外侧进行联接,同时保留至江边10k

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。