1、第28卷第7期王明年,等.广州地铁西村站近接高架桥桩基影响分区及应用研究•9•广州地铁西村站近接高架桥桩基影响分区及应用研究王明年1,崔光耀1,喻波2(1.西南交通大学土木工程学院,四川成都610031;2.中国中铁二院工程集团有限责任公司,四川成都610031)摘要:广州地铁西村站为暗挖法施工的隧道群,近接9组高架桥桩基,其中隧道与桩基XJ33最小净距仅2.30m。为保证高架桥的使用安全性,采用有限差分法和最小二乘法原理,对近接高架桥桩基进行近接影响分区研究,并根据分区结果对桩基进行分类,确定各类桩基沉降集中区,并对其提出可靠的加固方案;同时建立西村站近接桩基监控量测管理等级。研
2、究结果表明:西村站隧道洞室开挖对近接高架桥桩基的影响可分为4个区,相应地把近接桩基分为4类;A类桩的桩基沉降集中区为掌子面前2.0D(D为隧道洞径)及掌子面后3.0D区段,B类桩为掌子面前1.0D及掌子面后3.0D区段,C类桩为掌子面前0.5D及掌子面后2.0D区段;西村站范围内的9组桩基均为A类桩基,其中危险桩基为XJ25,XJ32,XJ34。通过现场应用,有效地控制了西村站隧道群开挖对近接高架桥桩基的影响,保证了施工安全,积累了成功经验,可为相似工程施工提供参考。关键词:隧道工程;桩基影响分区;桩基沉降集中区;监控量测管理等级中图分类号:U45;TU47文献标识码:A文章编号:
3、1000–6915(2009)07–0000–09RESEARCHONINFLUENTIALPARTITIONANDAPPLICATIONOFADJACENTVIADUCTPILEFOUNDATIONSINXICUNSTATIONOFGuangzhouMetroWANGMingnian1,CUIGuangyao1,YUBo2(1.SchoolofCivilEngineering,SouthwestJiaotongUniversity,Chengdu,Sichuan610031,China;2.ChinaRailwayNo.2EngineeringGroupCo.,Ltd.,Chen
4、gdu,Sichuan610031,China)Abstract:NinegroupsofviaductpilefoundationsarelocatedinthevicinityofXicunstationofGuangzhoumetrowhichisconstructedbysubsurfaceexcavationmethod.Theminimumcleardistanceis2.30mbetweenthetunnelofXicunstationandpilefoundationXJ33.Toensuretheusesafetyoftheviaduct,theleastsqua
5、resprincipleandfinitedifferencemethodareusedtostudytheinfluentialpartitionofthepilefoundations.Theoutcomeoftheinfluentialpartitionisusedforclassificationofpilefoundations.Andtheconcentratedareasofpilefoundationsettlementofthevarioustypesofpilefoundationsaredetermined.Theseresultsareappliedtopr
6、esenttheprogramofreinforcementandthemanagementlevelofmonitoringandmeasurementofthevarioustypesofpilefoundations.TheresultsshowthattheinfluentialpartitionoftheviaductpilefoundationisdividedintofourregionsbecauseofthetunnelexcavationofXicunstation.Accordingly,thepilefoundationsaredividedintofour
7、categories.TheconcentratedareaofpilefoundationsettlementofpiletypeAis2.0D(Disthediameteroftunnel)sectionbeforetunnelfaceand3.0Dsectionaftertunnelface,1.0Dsectionbeforetunnelfaceand3.0Dsection第28卷第7期王明年,等.广州地铁西村站近接高架桥桩基影响分区及应用研究•9•aftert