环氧树脂干式电力变压器安装技术要求(technical requirements for installation of epoxy dry type power transformers)

环氧树脂干式电力变压器安装技术要求(technical requirements for installation of epoxy dry type power transformers)

ID:11786236

大小:34.50 KB

页数:11页

时间:2018-07-14

环氧树脂干式电力变压器安装技术要求(technical requirements for installation of epoxy dry type power transformers)_第1页
环氧树脂干式电力变压器安装技术要求(technical requirements for installation of epoxy dry type power transformers)_第2页
环氧树脂干式电力变压器安装技术要求(technical requirements for installation of epoxy dry type power transformers)_第3页
环氧树脂干式电力变压器安装技术要求(technical requirements for installation of epoxy dry type power transformers)_第4页
环氧树脂干式电力变压器安装技术要求(technical requirements for installation of epoxy dry type power transformers)_第5页
资源描述:

《环氧树脂干式电力变压器安装技术要求(technical requirements for installation of epoxy dry type power transformers)》由会员上传分享,免费在线阅读,更多相关内容在教育资源-天天文库

1、环氧树脂干式电力变压器安装技术要求(Technicalrequirementsforinstallationofepoxydrytypepowertransformers)Technicalrequirementsforinstallationofepoxydrytypepowertransformers(1)preliminarypreparation;1)transformerinstallationdrawings,completeprocedures,andthroughthepowersect

2、orapprovalinformation.2)weshouldunderstandthedesignofthetransformerperformance,structuralcharacteristicsandrelatedtechnicalparameters.(2)equipmentandmaterialrequirements;1)transformerspecifications,models,capacityshouldcomplywiththedesignrequirements,and

3、itsaccessories,sparepartscomplete,andshouldhaveequipmentrelatedtechnicaldocuments,andproductfactorycertificate.Theequipmentshallbeequippedwithanameplate.Thenameplateshallindicatethemanufacturer'sname,ratedcapacity,oneortworatedvoltage,current,impedance,a

4、ndwiringgroup.2)auxiliarymaterial:weldingrod,antirustpaint,blendingpaintshouldcomplywiththedesignrequirements,andhaveproductqualificationcertificate.(3)workingconditions;1)transformer,indoorwalls,roofandfloorengineeringshouldbecompleted,theroofwaterproof

5、leakage,doorsandwindowsandglassinstallationintact,floorfinishingworkisover,theoutdoorfieldlevelingequipmentonthebasisofpreparationofmapconstructioniscompleted.Aftertheelectricitycannotredecorationworks,aswellastheoperationofsafetyprojects,constructioncom

6、pleted.2)reservedholeshavebeenembeddedparts,cleanupandadjustedtomeetthedesignrequirements.3)protectivenetworkdoors,railingsandothersafetyfacilities,ventilation,fireinstallation,installation.4)theconstructionqualityofbuildingsandstructuresrelatedtotheinst

7、allationofpowertransformersshallbeinconformitywiththeprovisionsofthecurrentbuildingconstructionandacceptancespecifications.Whentheequipmentanddesignhavespecialrequirements,itshouldcomplywithotherrequirements.(4)checkingoutofthebox1)thetransformerunpackin

8、gexaminationpersonnelshallbecomposedofconstructionunits,supervisionunits,constructionandinstallationunitsandsuppliers,andshalljointlychecktheequipmentoutoftheboxandmakearecordofit.2)checkoutoftheboxshouldbebasedontheconstr

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。