安装开工申请报告书(1)

安装开工申请报告书(1)

ID:28012938

大小:210.00 KB

页数:16页

时间:2018-12-07

安装开工申请报告书(1)_第1页
安装开工申请报告书(1)_第2页
安装开工申请报告书(1)_第3页
安装开工申请报告书(1)_第4页
安装开工申请报告书(1)_第5页
资源描述:

《安装开工申请报告书(1)》由会员上传分享,免费在线阅读,更多相关内容在应用文档-天天文库

1、电梯安装工程施工方案CHANGSHAFULINGDAELEVATORCO.LTD.长沙富菱达电梯有限公司whenprovisionsofgroundingshouldbedirectlyassociatedwiththegroundingconnectionoftheequipmentgrounding.5.1.10.2.2receivedaprotectiveearthinggroundingprotectionoflow-voltageelectricalequipmentinelectricalengineeringonline,theconnection

2、shouldbesolidandreliable,shouldnottheseriesgrounded.5.1.10.2.3protectionofgroundingresistanceofgroundandsignalgroundshouldbelessthan4ω,andthespacebetweentwogroundingelectrodemustbegreaterthan5M.5.1.10.2.4instrumentpanel(box,frame)withintheprotectiveearthing,ofthesignalcircuitgroundin

3、g,groundingandshieldingintrinsicallysafeinstrumentsystemgrounding,shouldreceiveseparategroundingbusbar;thegroundstraps,thegroundingofGeneralmainline,betweenthemainlineshouldbeinsulatedtoeachother.5.1.11instrumentdebuggingengineering5.1.11.1debuggingenvironmentandthepersonnelqualifica

4、tion6.4.1.11.1.1setinstrumentdebuggingbetweenandtheinstrumentequipmentwarehouse,itsworkshoparea,andindoorenvironmentrequirementsandthebyconfigurationofstandardinstrumentequipmentmustmeetengineeringdebuggingofrequirements,standardinstrumentinstrumentshouldhaseffectiveofidentificationq

5、ualifiedcertificate,itsbasicerrorsabsolute,notshouldoverwasschoolinstrumentbasicerrorsabsoluteof1/3,debuggingpersonnelshouldholdingcardinduction.5.1.11.1.2provideshighqualitycircuittestingofinstrumentbuilders.Circuittestingexposedproblemsintheprocessmustbeprocessedinatimelymanner;for

6、questionsrelatedtosystemconfigurationtoassistprocessingconfigurationengineer.Afterpassingthe5.1.11.1.3meterunitdebugginginthemeter15目录一、用户单位及待装电梯有关情况简介二、安装施工程序说明三、主要项目的施工工艺和技术要求四、安装人员的组织与设备设施的配置情况五、安装安全质量的组织措施与技术措施六、施工作业进度计划whenprovisionsofgroundingshouldbedirectlyassociatedwiththegr

7、oundingconnectionoftheequipmentgrounding.5.1.10.2.2receivedaprotectiveearthinggroundingprotectionoflow-voltageelectricalequipmentinelectricalengineeringonline,theconnectionshouldbesolidandreliable,shouldnottheseriesgrounded.5.1.10.2.3protectionofgroundingresistanceofgroundandsignalgr

8、oundshouldbe

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。