欢迎来到天天文库
浏览记录
ID:12666999
大小:144.10 KB
页数:9页
时间:2018-07-18
《计算基础工程量的手算示范》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库。
1、基础工程量建筑面积:(46.2+0.24)×(12.3+0.24)=582.36㎡土(石)方工程一平整场地S=(46.2+0.24+4.0)×(12.3+0.24+4)=834.28㎡二挖土方1独立基础土方:J-1:V=(2.4+0.3×2×1.3×7=81.9J-2:V=(2.6+0.3×2×1.3×5=66.56J-3:V=(2.9+0.3×2×1.35×1=16.54J-4:V=(2.5+0.3×2×1.3×2=24.99J-5:V=(3+0.3×2×1.35×3=52.49J-6:V=(3.2+0.3×2×1.4×1=20.22J-7:V=(2.3+0.3×2×1.3×2=21.
2、87J-8:V=(3.3+0.3×2×1.45×3=66.16V1=81.9+66.56+16.54+24.99+52.49+20.22+21.87+66.16=350.732、地梁土方DL1:(0.3+0.2)×(0.6+0.1)×(12.3-0.5×2)×8↑=31.64DL2:(0.25+0.2)×(0.4+0.1)×(9-0.15×2)×1↑=1.96DL3:(0.25+0.2)×(0.35+0.1)×(3.3-0.15×2)×1↑=0.61DL4:(0.25+0.2)×(0.4+0.1)×(4.8-0.15×2)×2↑=2.025DL5:(0.3+0.2)×(0.6+0.1)×
3、(7.5-0.15×2)×1↑=2.25DL6:(0.3+0.2)×(0.6+0.1)×(12.3-0.15×2)×2↑=8.4DL7:(0.2+0.2)×(0.3+0.1)×(3.45-0.15-0.125)×1↑=0.51DL8:(0.3+0.2)×(0.6+0.1)×(46.2-5×0.5-2×0.5)×3↑=44.84DL9:(0.3+0.2)×(0.5+0.1)×(6.6-0.3)×1↑=1.89DL10:(0.25+0.2)×(0.4+0.1)×(3.3-0.3)×1↑=0.675DL11:(0.25+0.2)×(0.4+0.1)×(9.9-0.3)×1↑=2.16DL12:
4、(0.3+0.2)×(0.3+0.1)×(3.3-0.3)×1↑=0.6V2=31.64+1.96+0.61+2.025+2.25+8.4+0.51+44.84+1.89+0.675+2.2+0.6=97.83=V1+V2=350.73+97.83=448.56三、回填土1、垫层砼及模板(基础)J-1:V1=2.4×2.4×0.1×7↑=4.032S1=2.4×0.1×4×7↑=6.72J-2:V2=2.6×2.6×0.1×5↑=3.38S2=2.6×4×0.1×5↑=5.2J-3:V3=2.9×2.9×0.1×1↑=0.841S3=2.9×2.4×0.1×7↑=J-4:V4=2.5×2
5、.5×0.1×2↑=1.25S4=2.4×4×0.1×1↑=1.16J-5:V5=3×3×0.1×3↑=2.7S5=3×4×0.1×3↑=3.6J-6:V6=3.2×3.2×0.1×1↑=1.024S6=3×4×0.1×1↑=1.2J-7:V7=2.3×2.3×0.1×2↑=1.058S7=2.3×4×0.1×2↑=1.84J-8:V8=3.3×3.3×0.1×3↑=3.267S8=3.3×3×0.1×3↑=0.99V总=17.552S总=22.71㎡2、独立基础砼及模板J-1:V1=(×0.3+×0.3)×7↑=13.713S1=(2.2×0.3×4+1.3×0.3×4)×7↑=29.
6、4J-2:V2=(×0.3+×0.3)×5↑=11.58S2=(2.4×0.3×4+1.4×0.3×4)×5↑=38.4J-3:V3=(×0.3+×0.35)×1↑=3.083S3=(2.7×0.3×4+1.6×0.35×4)×1↑=5.48J-4:V4=(×0.3+×0.3)×2↑=4.35S4=(2.3×0.3×4+1.4×0.3×4)×2↑=8.88J-5:V5=(×0.3+×0.35)×3↑=10.09S5=(2.8×0.3×4+1.7×0.35×4)×3↑=17.22J-6:V6=(×0.3+×0.4)×1↑=3.996S6=(3×0.3×4+1.8×0.4×4)×1↑=6.4
7、8J-7:V7=(×0.3+×0.3)×2↑=1.66S7=(2.1×0.3×4+1.3×0.3×4)×2↑=8.16J-8:V8=(×0.4+×0.35)×3↑=14.934S8=(3.1×0.4×4+1.8×0.35×4)×3↑=22.4V总=63.406S总=136.463、柱子(土中)V总3=0.5×0.5×0.3×16+0.6×0.6×0.3×8=2.0644、地梁垫层DL1:V1=0.5×0.1×(12.3-0.5×2)
此文档下载收益归作者所有